  176   Fri Dec 8 18:59:24 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the last two days, Viktor, Ronic and
I have started to install the mirror mounts
and try to align the cavity.
  
  177   Thu Dec 14 17:52:53 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the past few days, Viktor, Ronic and
I have continued to align the cavity.
We installed 4 mirrors and monitored the
 CCD.jpgoscillograph.jpg 
  178   Wed Dec 20 10:45:37 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignment- Over the last few days, Viktor, Ronic
and I have reinstalled the mounts and realigned
the cavity with CW laser and old mirrors.
 resonances.jpgcavity_mode.jpgcavity_mode_diameter.jpg 
  179   Wed Jan 10 18:35:46 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Recently we have focused on improving
the coupling efficiency. Without the telescope,
the original coupling efficiency was less
 Coupling_efficiency_0110.jpgdamaged_spot_on_M1.png 
  180   Mon Jan 15 19:19:00 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- We got 30% coupling efficiency by installing
a set of telescopes, adjusting the polarization
and optimizing the alignment. The diameter
 coupling_efficiency.jpgcavity_locking.jpg 
  181   Tue Jan 16 18:42:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomFSR and Finesse measurement- Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed
 Screenshot_2024-01-16_2_145546.pngScreenshot_2024-01-16_4_150258.png 
  182   Wed Jan 17 21:11:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsToday, Ronic and I installed the new mirrors
and got resonance. We can see the oscillations
in this high-finesse case. We haven't
 New_mirrors.pngoscillations.jpglocking.jpg 
  183   Thu Jan 18 22:14:03 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- In the last two days, Ronic and I installed
new mirrors after cleaning the environment,
and locked the cavity.
 New_mirrors.pngfinesse.pnglocking.jpg 
  184   Mon Jan 22 18:18:01 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- Today, Ronic and I changed the signal
generator to a low-noise one (with a delay
time of only 0.5 us). Then we moved
 New_finesse.png 
  185   Wed Jan 24 20:33:27 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsYesterday we checked the mirrors with
UV light and there was some dust on the mirrors,
especially M2.
 M2.jpg 
  186   Fri Jan 26 17:33:05 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday Daniele, Ronic and I cleaned the
mirrors and locked the cavity. However, the
finesse was only 13,000 because of the not
  
  187   Mon Feb 12 17:17:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today we cleaned the environment and
put the spin coater and microscope inside
the airflow.
 optical_room.jpg 
  188   Tue Feb 13 17:33:28 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday, Daniele and I cleaned mirrors one
by one using pure water, alcohol, and the
spin coater. Here are the measurements of
 2nd_measurement_F20606.png7th_measurement__F16563_bad_locking.png 
  189   Wed Feb 14 17:20:26 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today, Daniele and I cleaned the
cavity inside, recleaned the M2 and
M4 and their mounts, optimized the locking,
 F_25299.png 
  190   Wed Feb 21 17:33:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingThese days, Ronic, Daniele and I achieved
stable cavity locking with the menhir pulsed
laser.
 Screenshot_2024-02-21_1_110931.pngScreenshot_2024-02-21_110934.pngcalculation.jpg 
  191   Wed Feb 21 18:09:11 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingHere is a simulation of the relative FP-cavity
gain vs the CEP for a Finesse of 23000 and
taking into account the Menhir laser optical
 Relative_cavity_gain_vs_CEP.pngGain_vs_CEP.m 
  192   Mon Feb 26 08:58:33 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingLast week, Ronic and I focused on CEP
measurements of the menhir laser.


Measurements without
 Gain_vs_CEP.pngScreenshot_2024-02-23_0_183652.png 
  193   Mon Feb 26 16:53:24 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockinghere is the code to get this last curve




 Gain_vs_CEP.m 
  194   Tue Feb 27 17:51:56 2024 Xinyi LuFixedinfolasers and opticsOptical roomAmplified laser injectionIn the last two days, Ronic and I connected
the amplifier and locked the cavity.

- We installed an iris on the output
 Screenshot_2024-02-27_1_165535.png 
  196   Thu Mar 7 18:55:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- These days, Ronic, Fatematuj and I measured
the beam parameters of the output of the
third-stage amplifier.
 beam_after_lens.png 