HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   KBox Alignment , posted by Manar Amer at Optical room about lasers and optics 7x
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 6x
       Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Ma1_Ma2_Horizontal_Position_Optimized.pngMa1_Ma2_Vertical_Position_Optimized.pngAfter_M1_diaphram_1m_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Beam_Optimized.jpg
          Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 
             Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 9x
                Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx
                   Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg
                      Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg
                         Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Beating00_after_rotatingM2_2.jpg
                            Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics TM00_mode.jpgTM01_mode.jpgTM10_mode.jpg
                               Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 7x
                                  Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 
Message ID: 76     Entry time: Wed Apr 20 19:05:37 2022     Reply to this: 77
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: KBox Alignment  

Starting with the alignment of the KBox using CW Koheras.

The size of the CW output from the collimator at 1 meter from is ~ 2.4 mm, to be adjusted with lenses to match the cavity !!! (attached image)

For the 2 alignment mirrors, I am only able to control 3 axes for now (motor issue for the fourth to be fixed !!) , Horizontal and vertical for Ma1 and Horizontal for Ma2(closes to injection window).

Started with only irises placed on both the M1 and M2. Placed a beam profiler at the window behind M2 to observe an output beam.

Motors position for the 3 axes and beam shape and position after M2 attached.

Attachment 1: CW_Koheras_1meter_ColimatorOutput_NE40A_NE10B_NE01A_Beam.bmp  1.953 MB
Attachment 2: CW_Koheras_1meter_ColimatorOutput_NE40A_NE10B_NE01A_BeamFit.png  37 kB  | Hide | Hide all | Show all
CW_Koheras_1meter_ColimatorOutput_NE40A_NE10B_NE01A_BeamFit.png
Attachment 3: Ma1_Horizontal_Position.png  163 kB  | Hide | Hide all | Show all
Ma1_Horizontal_Position.png
Attachment 4: Ma1_Vertical_Position.png  163 kB  | Show | Hide all | Show all
Attachment 5: Ma2_Horizontal_Position.png  165 kB  | Hide | Hide all | Show all
Ma2_Horizontal_Position.png
Attachment 6: Transmission_M2_Irises_No_Mirrors_Beam.jpg  205 kB  | Hide | Hide all | Show all
Transmission_M2_Irises_No_Mirrors_Beam.jpg
Attachment 7: Transmission_M2_Irises_No_Mirrors_BeamFit.png  34 kB  | Hide | Hide all | Show all
Transmission_M2_Irises_No_Mirrors_BeamFit.png
ELOG V3.1.4-395e101