HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   High power experiments (200kW), posted by Xinyi Lu at Optical room about lasers and optics 202kW_power_at_8A_injection.pngStrange_drops.jpg
    Reply   High power experiments (200kW), posted by Xinyi Lu at Optical room about lasers and optics 
       Reply   High power experiments (272kW), posted by Xinyi Lu at Optical room about lasers and optics Screenshot_2024-03-27_7_270kW_7.5A.png210_kW_power_at_5A_injection.png272.3kW_at_7.5A.jpg
          Reply   Amplifier power and mirror transmission, posted by Xinyi Lu at Optical room about lasers and optics 3rd_amp_power.pngTransmission_measurement.png
             Reply   High power experiments (500kW), posted by Xinyi Lu at Optical room about lasers and optics record.pngpower_vs_time.pngcavitymode_vs_power.png
                Reply   High power experiments (520kW), posted by Xinyi Lu at Optical room about lasers and optics power_vs_time.pngcavitymode_vs_power_1.pngrecord.pnginjection_power_vs_intra_power.png
                   Reply   High power experiments (550kW), posted by Xinyi Lu at Optical room about lasers and optics record.pngpower_vs_time_550.jpg1A.JPG
                      Reply   Larger beam size & Spectrum, posted by Xinyi Lu at Optical room about lasers and optics cavitymode_vs_power_bigger.jpgspectrum.png
                         Reply   Different cavity modes & Pulse width, posted by Xinyi Lu at Optical room about lasers and optics cavitymode_vs_power_f.pngdifferent_cavity_mode_data.xlsx
                            Reply   Different cavity modes & Pulse width, posted by Xinyi Lu at Optical room about lasers and optics t_cvbg.pngt_amp.png
Message ID: 203     Entry time: Tue Mar 26 19:36:48 2024     Reply to this: 204
 Author: Xinyi Lu 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: Optical room 
 Title: High power experiments (200kW) 

These days, Ronic and I achieved 200kW inside the cavity and 70% coupling efficiency.

- By optimizing the telescope, the coupling reached 70% with iris fully open and maintained 60%-70% coupling at high power.

- The cavity mode went from 2.2mm,2.5mm (38kW) to finally 2.3mm,2.8mm (200kW) without changing a lot.

- Gradually raising the power while optimizing alignment, CEP, and locking, we got the following stable power:

Amp current (A) Injection power (W) Circulating power (kW) Gain
2 10 38 3800
2.3 14 50 3571
3 22 70 3181
4 35 115 3285
5 48 158 3292
8 87(Estimated) 202 2322

- Next steps:

  • Explain the strange drop phenomenon that occurs at high power, where both transmission and reflection drop, as in Fig. 2.
  • Maintains a half-hour locking at 200kW. Now the temperature of the amplifier at 8A is over 40 degrees, which may be risky.
Attachment 1: 202kW_power_at_8A_injection.png  807 kB  | Show | Hide all | Show all
Attachment 2: Strange_drops.jpg  327 kB  | Hide | Hide all | Show all
Strange_drops.jpg
ELOG V3.1.4-395e101