Entry   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG
       Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-08_2_182405.png
          Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg
             Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png
                Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
                   Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
                      Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics manip2miroirs.pptx2mirror_plan_shperical_beam_size.png
Message ID: 138     Entry time: Wed Aug 24 10:45:24 2022     In reply to: 106
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: 2 Mirror Setup @ 216.6 MHz 

Adding information about the 2 mirror cavity setup (plan - spherical) that is currently installed.

From Aurélien at the start of the manipulation.

@ 0 is where the injection mirror is located

 

Manar Amer wrote:

The SBox cavity setup was changed to have only 2 mirrors M1 plane and M2 spherical, both from ThomX

Distance between the mirror ~ 72 cm , increased from 70 cm to take into account the thickness of the ThomX mirrors

Two lenses (300 mm @ 50 cm , 200 @ 104 cm) were placed to have the beam radius ~ 0.55 mm.

The cavity was locked with a coupling of 60 %, for Finesse measurement the sweep was taken over 100 KHz of 2 seconds.

FSR ~ 210.00 MHz, line width ~ 8.56 KHz, Finesse ~ 24 500 .

 

 

 

Attachment 1: manip2miroirs.pptx  182 kB
Attachment 2: 2mirror_plan_shperical_beam_size.png  42 kB  | Show | Show all