HOME SBOX THOMX MINICAV Utilities
MINICAV orders MINICAV installation MINICAV commissioning MINICAV control command
  Status of commissioning, report also here plots are reports., Page 3 of 5  Not logged in ELOG logo
    Reply   Amplitude GHz oscillator phase noise with PZT effect, posted by Ronic Chiche at Optical room about lasers and optics PC4QR-SpecSheet-1.pdf
Thorlabs PZT datasheet.
Reference: PC4QR




Ronic
    Reply   1GHz oscillator Frep measurement, posted by Blanc at Optical room about mechanics | lasers and optics | detectors and electronics Spectre_GHz-3.PNG
The optical spectrum of the GHz oscillator: FWHM ~ 4nm




Blanc
wrote:


a previous cavity FSR measurement was giving a center frequency around 867.5MHz.
Entry   new smaract positions, posted by Aurélien Martens at Optical room about mechanics | software 
M1 and M2 at 5.1085mm and M3 and M4 at -2.9mm
    Reply   Cameras Calibration, posted by Kevin Dupraz at Optical room about lasers and optics | detectors and electronics grab2021-12-06_10-51-34_325_microscope.bmpgrab2021-12-06_10-52-11_108_microscope_calib_05mm_ruler.bmp
 




Kevin
Dupraz wrote:



After installing cameras the actual calibration are :
    Reply   Cameras Calibration, posted by Kevin Dupraz at Optical room about lasers and optics | detectors and electronics Plot_of_NF_Trans_calib_hex2mm__2021-06-23__17-06-49.pngPlot_of_NF_Refl_calib_hex2mm__2021-06-23__16-59-26.png
After check a mistake has been found on the magnification. This seems to be the good calibration (feel free to cross check). The projection of the 2mm
hex is attached

Entry   Manip 10 12 2021 (optimization injection Burst), posted by Kevin Dupraz at Optical room about lasers and optics NF_Refl__2021-12-10__14-25-08.pngtest__2021-12-10__14-25-08_1920_25gm.png
Manip 10/12/2021
Après recherche de la résonnance principale
    - MCS miroirs plan à 5.110250mm (en derive vers les negatifs)
Entry   Manip 14 12 2021 injection optimization (and calibration), posted by Kevin Dupraz at Optical room about lasers and optics Screenshot_2021-12-14_2_125459.png
Matin :

moteurs :
M1, M2 (plans): 5.110500m
    Reply   Manip 14 12 2021 injection optimization (and calibration), posted by Kevin Dupraz at Optical room about lasers and optics Screenshot_2021-12-14_3_182645.png
Après-midi :
    * Optimisation de l'alignement en injection pour avoir le plus de puissance en transmission
    * Optimisation (vérification) de la polarisation pour avoir le plus de couplage.
Entry   Manip 16 12 2021 montée en puissance, posted by Kevin Dupraz at Optical room about lasers and optics Screenshot_2021-12-16_0_115846.png
Matin: 
* Redémarrage Tangor 4W
    - couplage 15%
    Reply   Manip 16 12 2021 montée en puissance, posted by Kevin Dupraz at Optical room about lasers and optics Screenshot_2021-12-16_1_121553.png
 




Kevin
Dupraz wrote:



Matin: 
Entry   Changements et ajout d'optiques, posted by Blanc at Optical room about lasers and optics 
Optiques ajoutées :

- splitter 90/10 au début de la voie de réflexion, pour éjecter le flux et éviter que les lambdas ne chauffent.

- deuxième polariser pour avoir une meilleur extinction.
Entry   Manip 17 12 2021 reprise réf nouvelle injection pour polarisation, posted by Kevin Dupraz at Optical room about lasers and optics Screenshot_2021-12-17_0_164132.pngScreenshot_2021-12-17_1_170202.png
Tangor : 4.2W
* Réalignement de l'injection suite aux modifications :
    - Changement de l'ordre des waveplate maintenant : lambda/4, puis lambda/2
Entry   input and output power of the AOM 50MHz, posted by Blanc at Optical room about lasers and optics | detectors and electronics 
Input power of the AOM :

150mW

output power of the AOM :
Entry   Différence de fréquence Tangor/Lockline, posted by Blanc at Optical room about lasers and optics | detectors and electronics Freq_Tangor_Lockline_120_MHz.PNGFreq_Tangor_Lockline_80_MHz.PNGLock_Tangor_2W.PNG
- On a observé que le fondamental du Tangor et celui de la Lockline n'étaient pas situés à la même fréquence.
Avec la différence de tension donnée par le piezo entre les deux et le déplacement du piezo en fonction de la tension appliquée
donnée par sa datasheet (150 V pour 20 µm), on obtient un écart de fréquence de 121 MHz [Image 1].
Entry   Changement cadence et duty cycle + ref cam, posted by Blanc at Optical room about lasers and optics Ref_NF_inj_18_05_2022.pngRef_FF_inj_18_05_2022.pngScreenshot_2022-05-18_2_165654.pngScreenshot_2022-05-18_5_173440.pngScreenshot_2022-05-18_6_174947.png
- Prise des nouvelles ref caméras : NF{709;371} , FF{389;280} [Image 1 & 2]

- Placement d'une photodiode rapide en transmission pour voir le train d'impulsions du Tangor à travers la cavité.

- Lock du Tangor en quasi-continue, P_moy = 2W, 100 kHz.
Entry   Problèmes Cavitée, posted by Blanc at Optical room about lasers and optics Transmission.PNGNF_inj.PNGFF_inj.PNG
Précédentes ref pour lesquelles la manip fonctionnait :

Caméras :

709 ; 371 NF
Entry   Données pour la baisse en cadence, posted by Blanc at Optical room about lasers and optics 7x
Position Cam :

692;363 NF_inj
520;193 FF_inj
Entry   Tests et mesures lockline, posted by Blanc at Optical room about lasers and optics 
Mesures de puissance fibres lockline :

AVANT POLISSAGE

injection premier étage : 15 mW
    Reply   Tests et mesures lockline, posted by Blanc at Optical room about lasers and optics AOM_250_drivé_à_160_MHz_sortie_fibre_bleue.pngschéma_mesures_lockline_18_01_2023.PNG
 




Blanc
wrote:



Mesures de puissance fibres lockline :
Entry   Suite Mesures de puissance lockline, posted by Blanc at Optical room about lasers and optics schéma_mesures_lockline_19_01_2023.PNG20230119_124318.jpg
Changement d'AOM pour passer sur l'AOM 200 MHz.

Le schéma suivant récapitule les mesures prises.

Il y a eu une chute de la puissance en sortie de la fibre bleue de la lockline.
ELOG V3.1.4-395e101