  Status of commissioning, report also here plots are reports., Page 2 of 5  Not logged in ELOG logo
ID Date Author Status Typedown Category Location Title Text Attachments
  36   Wed Oct 20 12:36:15 2021 Ronic ChicheFixedreportlasers and opticsOptical roomAmplitude GHz oscillator phase noise with PZT effect3 phase noise measurements made on the
Amplitude GHz oscillator with different PZT
configurations :
 Amplitude_GHz_phase_noise.pngGHz_oscillator_phase_noise_without_front-end-1.png 
  38   Wed Oct 20 15:27:51 2021 Ronic ChicheFixedreportlasers and opticsOptical roomAmplitude GHz oscillator phase noise with PZT effectThorlabs PZT datasheet.
Reference: PC4QR

 PC4QR-SpecSheet-1.pdf 
  43   Thu Dec 2 16:12:17 2021 Aurélien MartensFixedreportmechanics | softwareOptical roomnew smaract positionsM1 and M2 at 5.1085mm and M3 and M4 at
-2.9mm
  
  46   Fri Dec 10 16:57:56 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 10 12 2021 (optimization injection Burst)Manip 10/12/2021
Après recherche de la résonnance
principale
 NF_Refl__2021-12-10__14-25-08.pngtest__2021-12-10__14-25-08_1920_25gm.png 
  47   Tue Dec 14 12:59:07 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Matin :

moteurs :
M1, M2 (plans): 5.110500m
 Screenshot_2021-12-14_2_125459.png 
  48   Thu Dec 16 10:40:55 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Après-midi :
    * Optimisation
de l'alignement en injection pour avoir
 Screenshot_2021-12-14_3_182645.png 
  49   Thu Dec 16 12:12:10 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissanceMatin: 
* Redémarrage Tangor 4W
    - couplage 15%
 Screenshot_2021-12-16_0_115846.png 
  50   Thu Dec 16 12:13:52 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissance 




 Screenshot_2021-12-16_1_121553.png 
  52   Fri Dec 17 17:03:34 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 17 12 2021 reprise réf nouvelle injection pour polarisationTangor : 4.2W
* Réalignement de l'injection
suite aux modifications :
 Screenshot_2021-12-17_0_164132.pngScreenshot_2021-12-17_1_170202.png 
  55   Thu May 19 10:04:05 2022 BlancUnder Processreportlasers and opticsOptical roomChangement cadence et duty cycle + ref cam- Prise des nouvelles ref caméras
: NF{709;371} , FF{389;280} [Image 1 &
2]
 Ref_NF_inj_18_05_2022.pngRef_FF_inj_18_05_2022.pngScreenshot_2022-05-18_2_165654.pngScreenshot_2022-05-18_5_173440.pngScreenshot_2022-05-18_6_174947.png 
  54   Tue May 17 17:28:31 2022 BlancFixedissuelasers and optics | detectors and electronicsOptical roomDifférence de fréquence Tangor/Lockline- On a observé que le fondamental
du Tangor et celui de la Lockline n'étaient
pas situés à la même
 Freq_Tangor_Lockline_120_MHz.PNGFreq_Tangor_Lockline_80_MHz.PNGLock_Tangor_2W.PNG 
  56   Tue Jun 14 11:16:37 2022 BlancUnder Processissuelasers and opticsOptical roomProblèmes CavitéePrécédentes ref pour lesquelles
la manip fonctionnait :

Caméras :
 Transmission.PNGNF_inj.PNGFF_inj.PNG 
  1   Tue Mar 23 18:33:16 2021 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomPhase noise measurement of the Amplitude MIKANInstallation of the MIKAN.
powermeter (with OD1) just after the
oscillator shows 440mW for 4A of the MIKAN
  
  2   Tue Apr 6 09:25:47 2021 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomPhase noise measurement of the Amplitude MIKANCoupling into a 50-50% fiber coupler using
the Thorlabs XYZ table NanoMax TS.
We reached 117mW after the 50% arm
  
  12   Fri May 7 15:40:10 2021 Ronic ChicheFixedinfolasers and opticsOptical roomTheoretical Finesse, Gain and CouplingFor spherical mirrors M3 and M4 (batch
C117I054) the reflectance (R) is around 99.9987%
(if T+R=1 => T=13ppm)
  
  13   Wed Jun 30 20:26:38 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras CalibrationAfter installing cameras the actual calibration
are :

NF_Refl: acA1920-40gm
 NF_Refl_calib_hex2mm__2021-06-23__16-59-26.bmpNF_Trans_calib_hex2mm__2021-06-23__17-06-49.bmpNF_Inj_calib_DIODE__2021-06-24__10-56-00.bmpNF_Inj_calib_DIODE__2021-06-24__10-42-00.bmpNF_Trans__2021-06-25__16-38-56.bmp 
  17   Tue Sep 7 14:27:07 2021 BlancFixedinfolasers and opticsOptical roomPolarisation Results of the NKTI made many tests about polarization and
we can see some points thanks to the following
figures :
 Ellipsicité_NKT.PNGPolar_horizontale_fonction_pussance_NKT.PNGPolar_verticale_fonction_pussance_NKT.PNGPolarisation_Ag_VS_Diélec.PNG 
  18   Tue Sep 7 17:48:50 2021 BlancFixedinfolasers and optics | detectors and electronicsOptical roomLocking of the cavity and setup changingWe change the setup a bit to have the same
polarization on the photodiode and the PDH
(in reflexion of the cavity). CF: schematics
 scope_0.png 
  19   Wed Sep 8 10:50:38 2021 BlancFixedinfolasers and opticsOptical roomPolarisation Results of the NKTTo have the polarisation, we must have
1 value because the laser in entry of the
system has 1 polar. Due to that, the graphe
 Tableau_polar.PNG 
  20   Thu Sep 9 16:34:37 2021 BlancFixedinfolasers and opticsOptical roomRing light in the cavityWe put a diaphragm in the input beam but
it doesn't work to suppress the ring
light only but it attenuates the whole transmitted
  