<?xml version="1.0" encoding="ISO-8859-1"?>
<rss version="2.0">
<channel>
<title>ELOG THOMX installation</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation</link>
<description>Status of installation, including shipping and de-installation of test setups.</description>
<generator>ELOG V3.1.4</generator>
<image>
<url>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/elog.png</url>
<title>ELOG THOMX+installation</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation</link>
</image>
<item>
<title>Ronic Chiche, Fixed, info, cabling, ThomX igloo, UPS installation and commissioning</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/52</link>
<description>
&lt;p&gt;I was able to lock back&amp;nbsp;the FP-cavity.&lt;/p&gt;

&lt;p&gt;at one moment, during the alignment optmization process of the infection mirrors of the FP-cavity, I had a huge misalignment moving Ma-Y motor.&lt;br /&gt;
I had to realign a lot this motor to get back to the standard power inside the FP-cavity.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;=&amp;gt; maybe one needs to make some &amp;quot;walking&amp;quot; procedure on the alignment mirrors to get the best alignment =&amp;gt; to be done&lt;/strong&gt;&lt;/p&gt;

&lt;p&gt;presently, the&amp;nbsp;lock @32% of amp ratio produces 50kW inside the FP-cavity.&lt;br /&gt;
CH0 Smaract motor = 107&amp;micro;m&lt;br /&gt;
CH2&amp;nbsp;Smaract motor = -113&amp;micro;m&lt;br /&gt;
&amp;#8203;&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;finally I installed the OneFive laser, the Smaract motors of the laser and the Arduino Peltier controller of the laser on the UPS plug.&lt;br /&gt;
			the power &amp;quot;seen&amp;quot; by the UPS is 0W, perharps because the used power is below 100W.&lt;br /&gt;
			the UPS says it can last 385mn (&amp;gt; 6h) in case of power shut down.&lt;/p&gt;

			&lt;p&gt;I had to do 10mm step at 10mm/s speed on CH0 of the Smaract motors to get back the&amp;nbsp;laser modelock.&lt;br /&gt;
			then, I put back the CH0 position at +140&amp;micro;m and the CH2 position at -177.8&amp;micro;m on the Smaract motor.&lt;/p&gt;

			&lt;p&gt;the present level measured by the laser amplifier is 3.05mW after the power ON of the laser @ CH0=0&amp;micro;m&lt;br /&gt;
			the&amp;nbsp;level measured by the laser amplifier is 3.012mW after the power ON of the laser @ CH0=+140&amp;micro;m&lt;/p&gt;

			&lt;p&gt;the&amp;nbsp;level measured by the laser amplifier is 3.125mW after the power ON of the laser @ CH0=+140&amp;micro;m when we switch ON the preamplifier&lt;br /&gt;
			then, we are able to check the laser repetition rate @ 33.383MHz measured by the amplifier software.&lt;/p&gt;

			&lt;p&gt;&amp;nbsp;&lt;/p&gt;

			&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090</description>
<pubDate>
Wed, 20 Dec 2023 12:59:00 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, cabling, ThomX igloo, UPS installation and commissioning</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/51</link>
<description>
&lt;p&gt;finally I installed the OneFive laser, the Smaract motors of the laser and the Arduino Peltier controller of the laser on the UPS plug.&lt;br /&gt;
the power &amp;quot;seen&amp;quot; by the UPS is 0W, perharps because the used power is below 100W.&lt;br /&gt;
the UPS says it can last 385mn (&amp;gt; 6h) in case of power shut down.&lt;/p&gt;

&lt;p&gt;I had to do 10mm step at 10mm/s speed on CH0 of the Smaract motors to get back the&amp;nbsp;laser modelock.&lt;br /&gt;
then, I put back the CH0 position at +140&amp;micro;m and the CH2 position at -177.8&amp;micro;m on the Smaract motor.&lt;/p&gt;

&lt;p&gt;the present level measured by the laser amplifier is 3.05mW after the power ON of the laser @ CH0=0&amp;micro;m&lt;br /&gt;
the&amp;nbsp;level measured by the laser amplifier is 3.012mW after the power ON of the laser @ CH0=+140&amp;micro;m&lt;/p&gt;

&lt;p&gt;the&amp;nbsp;level measured by the laser amplifier is 3.125mW after the power ON of the laser @ CH0=+140&amp;micro;m when we switch ON the preamplifier&lt;br /&gt;
then, we are able to check the laser repetition rate @ 33.383MHz measured by the amplifier software.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;Jean-Noel Cayla installed several days ago a Eaton 9PX 11kVA UPS inside the Igloo, outside of the ThomX bunker&lt;br /&gt;
			and I asked him to place only 1 UPS plug on the wall close to the FP-cavity to supply only the NKT/OneFive oscillator and the Smaract laser cavity motors.&lt;/p&gt;

			&lt;p&gt;I checked that if I plug a device on this UPS plug, I&amp;#39;m able to follow the power, used&amp;nbsp;by the device, on the UPS monitoring screen.&lt;/p&gt;

			&lt;p&gt;thus, this morning, I plan to switch off the laser oscillator and move its power cable from a standard plug to the&amp;nbsp;UPS plug and test if we are able to find back the previous performances of the locking.&lt;/p&gt;

			&lt;p&gt;the present Smaract motor positions are : CH0 =&amp;gt; +140&amp;micro;m / CH2 =&amp;gt; -177.8&amp;m</description>
<pubDate>
Wed, 20 Dec 2023 10:17:19 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, cabling, ThomX igloo, UPS installation and commissioning</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/50</link>
<description>
&lt;p&gt;Jean-Noel Cayla installed several days ago a Eaton 9PX 11kVA UPS inside the Igloo, outside of the ThomX bunker&lt;br /&gt;
and I asked him to place only 1 UPS plug on the wall close to the FP-cavity to supply only the NKT/OneFive oscillator and the Smaract laser cavity motors.&lt;/p&gt;

&lt;p&gt;I checked that if I plug a device on this UPS plug, I&amp;#39;m able to follow the power, used&amp;nbsp;by the device, on the UPS monitoring screen.&lt;/p&gt;

&lt;p&gt;thus, this morning, I plan to switch off the laser oscillator and move its power cable from a standard plug to the&amp;nbsp;UPS plug and test if we are able to find back the previous performances of the locking.&lt;/p&gt;

&lt;p&gt;the present Smaract motor positions are : CH0 =&amp;gt; +140&amp;micro;m / CH2 =&amp;gt; -177.8&amp;micro;m&lt;br /&gt;
as unpowering the motor will put the read position at 0&amp;micro;m, I first go back to 0&amp;micro;m for both channel.&lt;br /&gt;
I will put them back at their original values after I plug the motors&amp;nbsp;back to UPS.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Wed, 20 Dec 2023 09:35:36 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, issue, utilities, ThomX igloo, Airflow power breakdown</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/49</link>
<description>
&lt;p&gt;since around 2 weeks, the airflow above the optical table housing has a power breakdown when one tries to switch it on.&lt;/p&gt;

&lt;p&gt;the power breaker is in the electrical bay, on the left of the south entrance of ThomX.&lt;br /&gt;
the name of the power breaker switch related to the airflow is &amp;quot;TABLEAU ANNEAU 4&amp;quot;.&lt;/p&gt;

&lt;p&gt;today, with Kevin, we switched off all the airflow boxes 1 by 1 to find the defective ariflow box :&lt;br /&gt;
when we are face to the optical table housing panels, it is the third one from the left on the rear side.&lt;br /&gt;
this airflow box has been switched off (all the airflow boxes have a individual switch).&lt;br /&gt;
now, the airflow can be switched on again without any issue.&lt;/p&gt;

&lt;p&gt;one needs to order 1 replacement box + some spare ones =&amp;gt; mail to be sent to the AirC2 company.&lt;/p&gt;</description>
<pubDate>
Wed, 05 Jul 2023 16:50:50 +0200</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, utilities, ThomX igloo, Safety patrol instructions</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/48</link>
<description>
&lt;p&gt;after finishing the controlled intervention, you just have to exit the bunker with the 2 keys and place them back in their location&lt;/p&gt;

&lt;p&gt;then the controlled access (colored yellow) will turn to &amp;quot;access interdit&amp;quot; (red colored)&lt;/p&gt;

&lt;p&gt;to terminate the closure of the bunker, you just have to turn the two key indicated in the previous image back to their original position.&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;If one needs to work with 3rd stage on the laser amplifier, one needs to make the safety patrol inspection before closing the bunker.&lt;/p&gt;

			&lt;p&gt;for that, it is mandatory to switch 2 keys on the &amp;quot;key board&amp;quot; in the control room, just before or just after the safety patrol :&lt;br /&gt;
			- the THOMX key to 1&lt;br /&gt;
			- the &amp;quot;EXPLOITATION LASERFP&amp;quot; key to 1&lt;/p&gt;

			&lt;p&gt;for the safety patrol, one has to push the &amp;quot;blinking white&amp;quot; buttons on the walls of the bunker, in the order from 1 to 6, and finish by the south entrance door button.&lt;br /&gt;
			message &amp;quot; ronde en cours&amp;quot; is shouted during the process.&lt;br /&gt;
			at the end of the safety patrol, an alarm is triggered for 30sec approx. and then stop.&lt;br /&gt;
			now, the special keys located at the south entrance door are green and one has to take them (at least 2) to enter the bunker without breaking the safety patrol.&lt;/p&gt;

			&lt;p&gt;&amp;nbsp;&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Wed, 08 Feb 2023 13:48:33 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, utilities, ThomX igloo, Safety patrol instructions</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/47</link>
<description>
&lt;p&gt;If one needs to work with 3rd stage on the laser amplifier, one needs to make the safety patrol inspection before closing the bunker.&lt;/p&gt;

&lt;p&gt;for that, it is mandatory to switch 2 keys on the &amp;quot;key board&amp;quot; in the control room, just before or just after the safety patrol :&lt;br /&gt;
- the THOMX key to 1&lt;br /&gt;
- the &amp;quot;EXPLOITATION LASERFP&amp;quot; key to 1&lt;/p&gt;

&lt;p&gt;for the safety patrol, one has to push the &amp;quot;blinking white&amp;quot; buttons on the walls of the bunker, in the order from 1 to 6, and finish by the south entrance door button.&lt;br /&gt;
message &amp;quot; ronde en cours&amp;quot; is shouted during the process.&lt;br /&gt;
at the end of the safety patrol, an alarm is triggered for 30sec approx. and then stop.&lt;br /&gt;
now, the special keys located at the south entrance door are green and one has to take them (at least 2) to enter the bunker without breaking the safety patrol.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Wed, 08 Feb 2023 11:02:38 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, info, utilities, ThomX igloo, Alphanov amplifier chiller instruction manual </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/46</link>
<description>
&lt;p&gt;Adding the instructions manual for the Alphanov Amplifier SMC Chiller&lt;/p&gt;

&lt;p&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;!--EndFragment--&gt;&lt;!--StartFragment--&gt;&lt;span dir=&quot;ltr&quot; style=&quot;font-family:serif; font-size:14.2013px&quot;&gt;Installation and Maintenance Manual&lt;/span&gt;&lt;span dir=&quot;ltr&quot; style=&quot;font-family:serif; font-size:14.2013px&quot;&gt; Water Cooled Thermo Con for Rack Mount&lt;/span&gt;&lt;span dir=&quot;ltr&quot; style=&quot;font-family:serif; font-size:14.2013px&quot;&gt; HECR Series&lt;/span&gt;&lt;!--EndFragment--&gt;&lt;/p&gt;</description>
<pubDate>
Thu, 05 Jan 2023 10:16:38 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, detectors and electronics | software, ThomX igloo, Scope and Desktop computer removing</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/45</link>
<description>
&lt;p&gt;this afternoon, because of the test on the electron beam drive in the ring in the next days,&lt;br /&gt;
I removed the scope and the desktop computer (but not the display) installed close to the ThomX optical cavity.&lt;/p&gt;

&lt;p&gt;they have been stored in the &amp;quot;Viktor&amp;quot; ThomX optical room.&lt;/p&gt;</description>
<pubDate>
Thu, 25 Aug 2022 16:43:01 +0200</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, mechanics, ThomX igloo, Chiller installation + interlock</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/44</link>
<description>
&lt;p&gt;This morning, I started the chiller and opened the valves on the external water circuit =&amp;gt; no water leakage during the morning.&lt;/p&gt;

&lt;p&gt;now, the chiller will stay ON all the time =&amp;gt; we will check the installation at the end of the afternoon.&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;- this morning the chiller leakage has been fixed by adding some Teflon on the faulty Swagelock adapter.&lt;br /&gt;
			a long leakage test has to be done to be sure there is no leakage at all =&amp;gt; can be done on Friday during our tests.&lt;/p&gt;

			&lt;p&gt;- here is a picture of the 2 Alphanov amplifier controller interlocks.&lt;br /&gt;
			I2 has to be connected to the Sub-D15 connector of the SMC HECR008 chiller&lt;/p&gt;

			&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
				&lt;tbody&gt;
					&lt;tr&gt;
						&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
					&lt;/tr&gt;
					&lt;tr&gt;
						&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
						&lt;p&gt;- this morning with Aur&amp;eacute;lien, we filled the water tank of the chiller and we opened the water valves (last pipes on water arrival/departure panel).&lt;/p&gt;

						&lt;p&gt;there is no leakage on the external water circuit but there is a small one on one of the Swagelock adapters of the water circuit connected to the Alphanov Amplifier.&lt;br /&gt;
						we will add some Teflon to remove the leakage.&lt;/p&gt;

						&lt;p&gt;- the chiller alarm can be connected to the interlock detection of the Alphanov amplifier (I2 connector).&lt;br /&gt;
						we will have a closer look at the different connectors next time, as the Alphanov manual is not very clear on how to connect them together.&lt;/p&gt;
						&lt;/td&gt;
					&lt;/tr&gt;
				&lt;/tbody&gt;
			&lt;/table&gt;

			&lt;p&gt;&amp;nbsp;&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Fri, 11 Mar 2022 12:24:34 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, mechanics, ThomX igloo, Chiller installation + interlock</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/43</link>
<description>
&lt;p&gt;- this morning the chiller leakage has been fixed by adding some Teflon on the faulty Swagelock adapter.&lt;br /&gt;
a long leakage test has to be done to be sure there is no leakage at all =&amp;gt; can be done on Friday during our tests.&lt;/p&gt;

&lt;p&gt;- here is a picture of the 2 Alphanov amplifier controller interlocks.&lt;br /&gt;
I2 has to be connected to the Sub-D15 connector of the SMC HECR008 chiller&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;- this morning with Aur&amp;eacute;lien, we filled the water tank of the chiller and we opened the water valves (last pipes on water arrival/departure panel).&lt;/p&gt;

			&lt;p&gt;there is no leakage on the external water circuit but there is a small one on one of the Swagelock adapters of the water circuit connected to the Alphanov Amplifier.&lt;br /&gt;
			we will add some Teflon to remove the leakage.&lt;/p&gt;

			&lt;p&gt;- the chiller alarm can be connected to the interlock detection of the Alphanov amplifier (I2 connector).&lt;br /&gt;
			we will have a closer look at the different connectors next time, as the Alphanov manual is not very clear on how to connect them together.&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Wed, 09 Mar 2022 10:51:59 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, mechanics, ThomX igloo, Chiller installation + interlock</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/42</link>
<description>
&lt;p&gt;- this morning with Aur&amp;eacute;lien, we filled the water tank of the chiller and we opened the water valves (last pipes on water arrival/departure panel).&lt;/p&gt;

&lt;p&gt;there is no leakage on the external water circuit but there is a small one on one of the Swagelock adapters of the water circuit connected to the Alphanov Amplifier.&lt;br /&gt;
we will add some Teflon to remove the leakage.&lt;/p&gt;

&lt;p&gt;- the chiller alarm can be connected to the interlock detection of the Alphanov amplifier (I2 connector).&lt;br /&gt;
we will have a closer look at the different connectors next time, as the Alphanov manual is not very clear on how to connect them together.&lt;/p&gt;</description>
<pubDate>
Tue, 08 Mar 2022 12:40:00 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, mechanics | lasers and optics, ThomX igloo, shutter base plate, L-shape arm and housing frame</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/41</link>
<description>
&lt;p&gt;This afternoon with Yann:&lt;br /&gt;
- we changed the shutter base plate position to center the beam axis with the mirrors center =&amp;gt; to be checked with the amplifier beam&lt;br /&gt;
- on the L-shaped arm, the axis along the cavity beam has been centered. it should be never moved !!! (it corresponds to the less accessible knob).&lt;br /&gt;
Yann confirmed the 2 other translation axis of the L-shaped arm follow the back plate position.&lt;br /&gt;
These 2 axis have been positioned to put the L-shape plate completely of the beam path.&lt;br /&gt;
- the panel of the housing which was shifted has been fixed. now, it is properly aligned.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Thu, 10 Feb 2022 15:08:41 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, cabling, ThomX igloo, Power supplies switched off</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/40</link>
<description>
&lt;p&gt;This afternoon, an electrical operation will be done in ThomX, impacting possibly the casemate power supplies.&lt;/p&gt;

&lt;p&gt;Then we shut down all the equipment.&lt;/p&gt;</description>
<pubDate>
Thu, 10 Feb 2022 09:41:54 +0100</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, cabling, ThomX igloo, new power supplies connexions</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/39</link>
<description>
&lt;p&gt;this afternoon with Viktor, we redid all the power supplies connexions.&lt;/p&gt;

&lt;p&gt;4x cables are now connected to the wall sockets.&lt;br /&gt;
- 1x extension cable for the mini-rack multi-sockets cable.&lt;br /&gt;
- 3x triple-sockets long cables (3.5kW each).&lt;/p&gt;

&lt;p&gt;all other cables have been removed and replaced.&lt;/p&gt;

&lt;p&gt;we brought the other half-rack next to the first one.&lt;/p&gt;</description>
<pubDate>
Wed, 19 Jan 2022 18:32:47 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, lasers and optics, ThomX igloo, One Five laser moved </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/THOMX+installation/38</link>
<description>
&lt;p&gt;The &lt;strong&gt;One Five laser&lt;/strong&gt; and its controller have been moved from PLIC to ThomX Iglo.&lt;/p&gt;

&lt;p&gt;In preparation to Install the Amplifier from Alphanov&lt;/p&gt;</description>
<pubDate>
Tue, 11 Jan 2022 10:32:45 +0100</pubDate>
</item>
</channel>
</rss>
