Entry   Power shut down on August 29th, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
This morning, all the equipments have been switched off due to a power shut down tomorrow morning.
Only the Onefive oscillator is still ON, connected to the Uninterruptable Power Supply (UPS).
    Reply   Power shut down on August 29th, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
after alignment, CEP adjustment and optimizing the PDH phase, I got back ~92kW in the FPC for 33% amplifier ratio.




Ronic
Chiche wrote:



This morning, all the equipments have been switched off due to
Entry   Electrical trouble (disjunction), posted by Loïc Amoudry at Optical room about cabling 
The circuit breaker on ThomX cavity drops @1.5-1.8kW when we turn on 1/2nd stage of the amplifier or 3rd stage of the amplifier.
Amplifiers are now connected to K-BOX UPS.

We are buying a clamp ammeter for further investigations.