  264   Mon Sep 18 17:12:07 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!it could be also an optical unstability,
as when the intra-cavity power increases,
the radius of curvatures of the mirrors increases
  
  265   Wed Sep 20 14:16:09 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!This morning,

- I installed the fast feedback
loop.
 20230920_131634.jpg20230920_131559.jpg 
  266   Wed Sep 20 19:10:16 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!this afternoon, in adjusting the CEP and
improving the parameters of the lock, I was
able to get ~ 47kW stable inside the cavity,
  