HOME
SBOX
THOMX
MINICAV
Utilities
THOMX orders
THOMX installation
THOMX commissioning
THOMX control command
Status of commissioning, report also here plots are reports., Page 18 of 24
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
463 Entries
Goto page
Previous
1
,
2
,
3
...
17
, 18,
19
...
22
,
23
,
24
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
474
Thu Jun 25 16:04:34 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
the pressure level with the ionic pump
was limited to ~ 1.5 .10**-7 mbar after several
days of pumping, due to some leakage located
475
Fri Jun 26 09:42:31 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
this morning, the vacuum level is still
around 1.9 10**-7.
the vacuum guys said that last
109
Thu Dec 2 21:31:21 2021
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
FP cavity alignment
Note the direction of injection is
M1 - M2 - M3 - M4
110
Tue Jan 11 10:36:35 2022
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
FP cavity alignment
The alignment is on hold until next week
17th - 18th Jan
an Alignment attempt will be done
113
Mon Jan 17 21:22:28 2022
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
FP cavity alignment
***** Continuation of the alignment ----
FP Cavity Open --- ****
The cavity was put under outer
114
Wed Jan 19 09:36:53 2022
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
FP cavity alignment
Yesterday, we did the alignment again using
Iris and beam profilers to obtain a more
precise result.
115
Tue Feb 1 14:17:02 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
Installed and inputs:
CW laser ; power = 101
mW
PDH ;
at output
Low
116
Tue Feb 1 16:40:06 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
This afternoon, I did some alignment of
the injection mirrors with a fast scan on
the LaseLock to get a regular transmission
117
Wed Feb 2 11:22:51 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
This morning with Manar, we installed the
AOM+RF amplifier and the associated fast
feedback loop.
118
Wed Feb 2 11:41:01 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
Adding Oscilloscope images
delocked + locked intervals
showing the 20% coupling
lock
119
Thu Feb 3 13:56:24 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
Ending alignment series !!
120
Thu Feb 3 14:10:08 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
As it can be seen on the first plot, even
with a good locking (good reduction of "high"
frequencies noise: we had better locking
121
Thu Feb 3 14:11:50 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
Cavity Lock and Finess measurment
This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed.
6x
123
Thu Feb 3 18:40:04 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
FP cavity alignment
The fluctuation problem has been solved.
It was simply the new scheme to inject
2 RF frequencies in a single EOM.
125
Thu Feb 3 18:59:10 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
Cavity Lock and Finess measurment
to measure the Finesse, instead
of having 2x EOM for the PDH and for the
126
Thu Feb 3 19:01:04 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
Cavity Lock and Finess measurment
After changing the way of injecting
modulation for PDH and modulation for FSR
127
Fri Feb 4 10:59:56 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
ThomX igloo
Cavity Lock and Finess measurment
one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path.
129
Fri Mar 11 12:59:35 2022
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
Cavity beam Image
Updated beam image after change on the
mode axis.
Taken after P4.
132
Mon Mar 14 18:39:40 2022
Manar Amer
Fixed
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
Current Installed Setup
Attached is the current setup in ThomX
135
Tue Mar 22 21:19:48 2022
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
Alphanov amplifier Beam Profile
Today: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power.
8x
Goto page
Previous
1
,
2
,
3
...
17
, 18,
19
...
22
,
23
,
24
Next
All
ELOG V3.1.4-395e101