Message ID: 92     Entry time: Tue Feb 18 12:24:00 2020
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: ThomX Locked with CVBGs 

ThomX has been locked with a new telescope while using compression CVBGs.
Coupling is ~50-55% and lock is stable.

Power up to ~50kW should follow up soon (stop when HOM are observed). We'll not go over ~100kW to not risk any breakdown due to the short pulse length (~2.5 ps).

Fabian and Ronic discussed LIDT (laser induced damage threshold) for Ta2O5 at 2.5 ps is => 1J/cm²
We have w > 2 mm ( => surface ~= 0.126 cm²) . At 100 kW it means 800 kW/cm². At 33.33 MHz it means 24 mJ/cm². With 2.5 ps, peak power is 10 GW/cm² (1.2 GW peak).

 

 

Attachment 1: tek00001.png  72 kB  | Show | Hide all | Show all
Attachment 2: tek0002CH1.isf  19 kB
Attachment 3: tek0002CH2.isf  19 kB
Attachment 4: tek0002CH3.isf  19 kB
Attachment 5: tek0002CH4.isf  19 kB
ELOG V3.1.4-395e101