HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 56     Entry time: Fri Sep 6 14:48:14 2019
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: mechanics | vacuum 
 Location: Optical room 
 Title: Primary vacuum to check dust 

The cavity has been cleaned then put under primary vacuum (primary pump without vacuum flow control). Dusts presence was checked at air and no significant changes have been observed.

1ST image before cleaning
2ND image after cleaning
No changes after coming back from primary vacuum

Attachment 1: Image3.jpg  24 kB  | Show | Hide all | Show all
Attachment 2: Image6.jpg  19 kB  | Hide | Hide all | Show all
Image6.jpg
ELOG V3.1.4-395e101