  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   air conditionning in ThomX Bunker, posted by Ronic Chiche at ThomX igloo about lasers and optics temp.png
    Reply   air conditionning in ThomX Bunker, posted by Ronic Chiche at ThomX igloo about lasers and optics Sans_titre.png
       Reply   air conditionning in ThomX Bunker, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Message ID: 423     Entry time: Tue May 6 09:29:43 2025     In reply to: 422     Reply to this: 424
 Author: Ronic Chiche 
 Status: Under Process 
 Type: report 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: air conditionning in ThomX Bunker 

after the new temperature setting for the bunker air cooling (winter to summer transition), the temperature drop from 24° to 20°C which induced a slight misalignment between the onefive oscillator and the fiber injection.
the amplifier photodiode PD_IN which checks the amplifier power injection drop also from 3mW to 2.885mW... hopefully, it is enough to start the amplifier without realignment.

but bad news, I don't see any transmission of the cavity... to be checked...

Ronic Chiche wrote:

The temperature slitly increase in thomx Bunker from 23° to 24° during the last day.

The thermalisation of the CFP is very long...

In any case the operation of the CFP is so easy, it seems to be correlated to the weather... tody it's very nice as of hte rest of the week.

The stored power is easily 94 KW and there is not jump or delock problems.

The temperature of the bunker continiusly increase and now we observe some delocking du to high frq perturbations... may be the twe things are correlated.

 