  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Amplifier mission Bordeaux, posted by Loïc Amoudry at Other about mechanics | lasers and optics 1st_and_2nd_stage.jpg3rd_stage_pumps.jpg3rd_stage_signal.jpg
    Reply   Amplifier mission Bordeaux, posted by Loïc Amoudry at Other about mechanics | lasers and optics Ampli_ThomX.PNGM2_ThomX.png
Message ID: 40     Entry time: Tue Jun 11 18:03:10 2019     Reply to this: 41
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: mechanics | lasers and optics 
 Location: Other 
 Title: Amplifier mission Bordeaux 

Voyage Bordeaux au CELIA avec Jérôme LHERMITE (Loïc et Titoutan)

1er jour (34°) :

Mesure du spectre et de la puissance des 4 diodes de pompe 3ème étage jusqu’à ~60W (12A).
Mécanique et câblage ampli.

2ème jour (30°) :

Soudure des fibres des diodes de pompe 3ème étage avec les fibres du recirculateur.
Câblage entre les 2 boitiers et fixation des fibres dans le boitier du 3ème étage.

3ème jour (26°) :

Connexion refroidissement à eau du recirculateur (chiller).
Soudure fibre CFBG avant 1er étage (temporaire pour faire des mesure).
Mise en place des éléments 1er et 2ème étage sur le support de l’ampli.
Montée en puissance 35W.

4ème jour :

Adaptation du mode de sortie en contrôlant la position de la fibre avant le collimateur.
Mesure de M².
 

Attachment 1: 1st_and_2nd_stage.jpg  744 kB  | Hide | Hide all | Show all
1st_and_2nd_stage.jpg
Attachment 2: 3rd_stage_pumps.jpg  808 kB  | Show | Hide all | Show all
Attachment 3: 3rd_stage_signal.jpg  819 kB  | Hide | Hide all | Show all
3rd_stage_signal.jpg