HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
    Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics Capture.JPG
       Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
          Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 20241204_125955.jpg
             Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics Capture.JPG
                   Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics Capture.JPG
                      Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                         Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                            Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                               Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                  Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                     Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                        Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                           Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                              Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                                 Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
                                                    Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 2025-07-07_-_long_run.png
                                                       Reply   day by day run for X-ray production, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 2025-07-08_-_long_run.png
Message ID: 383     Entry time: Tue Nov 26 18:00:14 2024     In reply to: 382     Reply to this: 384
 Author: Ronic Chiche 
 Status: Under Process 
 Type: report 
 Category: mechanics | lasers and optics | detectors and electronics 
 Location: ThomX igloo 
 Title: day by day run for X-ray production 

at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.

we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.

Ronic Chiche wrote:

the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.

for the laser cavity : 1.496 560 mm => 1.564 560 mm

the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.

optimum CEP position : -210.8µm => -192µm

I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.

 

 