HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 30     Entry time: Fri Apr 5 11:28:39 2019
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Finesse with P1 SUPRASIL 

P1 SUPRASIL has been installed instead of P1 Sapphire. It has been cleaned 3 times on each face with wipe+isopropanol before to be installed.

Finesse ~= 10 000 - 11 000 (EOM Sweep of 100 kHz in 10sec, see last image.)
Coupling ~= 45%

Motors position:
P1 = -825 000
S2 = +825 000
S3 = +825 000
P4 = -825 000

Attachment 1: 190404_mode_size_with_P1_SUPRASIL.PNG  908 kB  | Show | Hide all | Show all
Attachment 2: 190404_mode_fit_with_P1_SUPRASIL.PNG  261 kB  | Show | Hide all | Show all
Attachment 3: tek00000.png  47 kB  | Hide | Hide all | Show all
tek00000.png
Attachment 4: tek00002.png  49 kB  | Hide | Hide all | Show all
tek00002.png
ELOG V3.1.4-395e101