HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 271     Entry time: Mon Oct 9 13:11:23 2023
 Author: Daniele Nutarelli 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: Tests of pointing stability of the laser CFP 

Last monday with Victor we have cheked the stability of de pointing of the laser FP.

The climatisation was operating since 3 days in satble way. The laser pointing was very stable before to inejct in to the cavity (picture 1) and also for the reflexion from the cavity (picture 2).

That means thant it is necessary to have a stable climatisation operation.

Attachment 1: IMG_20231003_155009_resized_20231009_103610100.jpg  240 kB  | Hide | Hide all
IMG_20231003_155009_resized_20231009_103610100.jpg
Attachment 2: IMG_20231003_155458_resized_20231009_103610449.jpg  241 kB  | Hide | Hide all
IMG_20231003_155458_resized_20231009_103610449.jpg
ELOG V3.1.4-395e101