HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 270     Entry time: Fri Sep 22 11:30:28 2023
 Author: Daniele Nutarelli 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Laser FP operation 

This morning FP Laser was operating well locked at 30 KWatts in stable vay.

There are some fluctuations due tu pointing instabilities probably dues to temperature fluctuations in de bunker.

In the attacced picture are reported the lock parameters and signals.

By adjusting the position of laser caviti length the lock old all de morning.

Attachment 1: IMG_20230922_105006_resized_20230922_111612040.jpg  304 kB  | Hide | Hide all
IMG_20230922_105006_resized_20230922_111612040.jpg
ELOG V3.1.4-395e101