HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 22     Entry time: Tue Mar 26 18:32:40 2019
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: mechanics | lasers and optics | cabling 
 Location: Optical room 
 Title: Wires in laser path 

There was some ceramic wires close to the beem path right before P4. We moved them away (we can imagine they could move again with vibration).

Attachment 1: before.jpg  140 kB  | Show | Hide all | Show all
Attachment 2: after_wire_displaced.jpg  160 kB  | Hide | Hide all | Show all
after_wire_displaced.jpg
ELOG V3.1.4-395e101