  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 8x
    Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 
       Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 6x
          Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 
             Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 9x
                Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 20220401_Alphanov_Beam_setup_after_compressor.jpg20220401_Amplifier_AfterCompressor_50perc_133MHz.bmp20220401_Amplifier_AfterCompressor_60perc_133MHz.bmp20220401_Amplifier_AfterCompressor_50perc_133MHz_BeamFit.png20220401_Amplifier_AfterCompressor_60perc_133MHz_BeamFit.png
                   Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 6x
                      Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 12x
                         Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 20x
                            Reply   Alphanov amplifier Beam Profile, posted by Manar Amer at ThomX igloo about lasers and optics 8x
Message ID: 147     Entry time: Fri Apr 15 19:00:20 2022     In reply to: 142     Reply to this: 148
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: Alphanov amplifier Beam Profile 

Victor, Ronic, Manar

Today  was dedicated to the study of the CVBG, and it's effect on the beam profile

we opened the box containing the 2 CVBGs : The 2CVBG are glued from the bottom on a copper surface .

Using the beam viwer, the beam line inside the two CVBG is not at the exact center but not at the edges too and not hitting the boarders.

From the sides you see two lines, one is reflection on the metal.

 

To observe the effect of the first CVBG by itself, we blocked the second reflection into the 2nd CVBG.

By placing the D-shaped mirror just at the entrance of the 2nd CVBG (there was just enough space to put it)

Beam Profiler + OD 10E + OD 30E + OD(not known) placed at ~ 1 m from the output of compressor.

We see clearly a much better circular shape of the beam and a better Gaussian fit,

only above 90% where we see the fit percentage going down to ~ 86% and on just the Horizontal Axis.

 


 

 

 

Manar Amer wrote:

This Morning, another reading was taken for the output of the amplifier after the compressor using 2 wedge mirrors.

In addition, a start of the calibration of a PulseCheck "Autocorrelator" to measure the pulse duration. 

note, the pulsed laser used is OneFive 133.33 MHz

Manar Amer wrote:

Adding the readings  20% , 30% ,  40%  for output of amplifier after the compressor

 

Manar Amer wrote:

Readings of the beam shape and fit at the output of the compressor

differance from previous reading is that here we used wedges instead of HR mirrors.

Similar to previous readings, the beam shape deforms and the Gaussian fit is bad after 50% amplification

Manar Amer wrote:

Readings of the beam shape and horizontal (upper plot) and vertical (lower plot) axis fit at the direct output of the amplifier.

The beam shape relatively shaped like an egg.

Manar Amer wrote:

Today a second reading of the beam profile was done , with Victor ,Ronic, Aurlien and Manar

an additional set-up was made using two 4 deg wedges instead of High reflecting (HR) and Anti-reflecting (AR) mirrors.

Two reading were taken:

  • at the output of the compressor with a NE30A filter on the beam profiler
  • at the output of the amplifier with NE30A + NE10A filter on beam profiler

 

 

Manar Amer wrote:

Adding the fitted beam in 1D in Horizontal and vertical axis.

for 10%   to  60%

Manar Amer wrote:

 

Manar Amer wrote:

Today: Manar, Ronic and Aurlien started the study of the beam profile of the alphanov amplifier at high power.

The setup shown in the image shows how the power is reduced by using Anti-reflective mirrors,

pick up 1 : Anti-reflective coating on both sides , pick up 2 : Anti-reflective coating on one side and High reflectivity on the other

 

using this method, we avoid saturation and damage to the beam profiler from the high power amplified laser

in addition, an OD3 filter is placed in front of the beam profiler. and a reflective mirror is placed close to deflect the reflection from the mirror(pick up 1) second surface.

The beam observed is relatively well shaped and fitted up to 50% of amplification is where the shape starts to deform a little and is not well-fitted by a Gaussian. (image attached shows the fit for 60% amplification)

The cause is yet to be determined, as it could only be related to the reflections that occur from the mirrors (pick up 1 and pick up 2)

 

*** Note be always careful at High Power :)

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: 20220415_Inside_CVBG_Box.jpg  13 kB  | Hide | Hide all | Show all
20220415_Inside_CVBG_Box.jpg
Attachment 2: 20220415_CVBG.jpg  71 kB  | Show | Hide all | Show all
Attachment 3: 20220415_Compressor_Box.png  137 kB  | Hide | Hide all | Show all
20220415_Compressor_Box.png
Attachment 4: 10p_1CVBG.bmp  1.847 MB
Attachment 5: 20p_1CVBG.bmp  1.847 MB
Attachment 6: 30p_1CVBG.bmp  1.847 MB
Attachment 7: 40p_1CVBG.bmp  1.847 MB
Attachment 8: 50p_1CVBG.bmp  1.847 MB
Attachment 9: 60p_1CVBG.bmp  1.847 MB
Attachment 10: 70p_1CVBG.bmp  1.847 MB
Attachment 11: 90p_1CVBG.bmp  1.847 MB
Attachment 12: 20220415_D_shaped_Mirror_Blocking_2ndCVBG.jpg  86 kB  | Hide | Hide all | Show all
20220415_D_shaped_Mirror_Blocking_2ndCVBG.jpg
Attachment 13: 10p_1CVBG_BeamFit.png  38 kB  | Show | Hide all | Show all
Attachment 14: 20p_1CVBG_BeamFit.png  38 kB  | Hide | Hide all | Show all
20p_1CVBG_BeamFit.png
Attachment 15: 30p_1CVBG_BeamFit.png  37 kB  | Show | Hide all | Show all
Attachment 16: 40p_1CVBG_BeamFit.png  36 kB  | Show | Hide all | Show all
Attachment 17: 50p_1CVBG_BeamFit.png  37 kB  | Hide | Hide all | Show all
50p_1CVBG_BeamFit.png
Attachment 18: 60p_1CVBG_BeamFit.png  38 kB  | Hide | Hide all | Show all
60p_1CVBG_BeamFit.png
Attachment 19: 70p_1CVBG_BeamFit.png  38 kB  | Hide | Hide all | Show all
70p_1CVBG_BeamFit.png
Attachment 20: 90p_1CVBG_BeamFit.png  39 kB  | Show | Hide all | Show all