Entry   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics 2021_12_02_M2_Transmission.jpg2021_12_02_M3_transmission_90deg.PNG
    Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics 
       Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics Interior_of_cavity_P1_S3_windowOpen.jpgInterior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpgCavityAlignment_cavityOpen_S2_Output.jpgCavityAlignment_cavityOpen_S3_Output.jpeg
          Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics 
             Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics ThomX_FP_setup_01-02-2022.pngtek0002.png
                Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
                   Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
                      Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics tek0003.pngtek0006.pngtek0007.png
                         Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
                         Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
                            Reply   FP cavity alignment , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
Message ID: 113     Entry time: Mon Jan 17 21:22:28 2022     In reply to: 110     Reply to this: 114
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: FP cavity alignment  

***** Continuation of the alignment ---- FP Cavity Open --- ****

The cavity was put under outer pressure and was opened for the alignment

The alignment was done using CW koheras infrared laser and  the inside mirrors irises

we observed the beam output centered at S2, S3 and P4

transmission from S4 to P1 was aligned at the center of P1 iris and an outside reference was fixed, then P1 mirror was placed, and we aligned the reflection with the transmission.

....... After the interior alignment, the cavity windows were closed ....

A beam profiler was placed at P4 transmission -----> nothing observed even with a piezo drive on the CW infrared  laser

observed a beam output at S2 and S3, but the fundamental mode is not seen, or even a higher order mode (which we can't explain, as the beam is centered on the mirrors)

images show the output at S2 and S3

 

Manar Amer wrote:

The alignment is on hold until next week 17th - 18th  Jan

an Alignment attempt will be done when the ring part close to the FP cavity is opened.

Manar Amer wrote:

Note the direction of injection is     M1 - M2 - M3 - M4

                                                       P1 - S2 - S3 - P4

The injected beam is aligned at the center of the irises placed at the windows mounts of mirror M1 (Injection) and M2(spherical)

At Transmission of M2 :  in addition to centered beam, we observe diffraction which interferes in observing the beating at M2 output

(could be diffracted beam from the metal pipes inside or from the D-shaped mirror installed inside)

At Transmission of M3 : we observe a beam output could be part of TM00 mode (the shape is distorted !!)

suspicious reasons :

  •  when we have a frequency sweep on the CW(Koheras) piezo; we observe it beating (when increasing the drive it is increasing in intensity)
  • when we adjust the alignment mirrors; the beam doesn't change position and only its intensity changes

  continuation with the alignment and try to eliminate the diffraction and find the shape of the beam.

A manual change in the D-shaped mirror position to remove any possible effects from it.

 

 

 

Attachment 1: Interior_of_cavity_P1_S3_windowOpen.jpg  84 kB  | Show | Hide all | Show all
Attachment 2: Interior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpg  49 kB  | Hide | Hide all | Show all
Interior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpg
Attachment 3: CavityAlignment_cavityOpen_S2_Output.jpg  141 kB  | Hide | Hide all | Show all
CavityAlignment_cavityOpen_S2_Output.jpg
Attachment 4: CavityAlignment_cavityOpen_S3_Output.jpeg  145 kB  | Show | Hide all | Show all
ELOG V3.1.4-395e101