  15   Thu Jun 9 19:39:00 2022 Manar AmerFixedreportvacuumOptical roomCavity Box Under Vacuum Yesterday evening, we closed Cavity Box
and placed it under the primary pump for
~2 hours. then for lack of time we switched
 20220608_cavuum_curve.jpeg20220609_vacuum_curve.jpeg 
  1   Wed Sep 12 18:18:08 2018 Ronic ChicheFixedinfoutilitiesOptical roomfirst entry in logbookfirst entry in logbook   
  14   Tue May 10 17:00:15 2022 Manar AmerUnder ProcessreportutilitiesOptical roomReplacing prefilters for filter unitThe 5 prefilters for the SBox have been
changed and at the same time a cleaning of
the visible part of the motor was done using
 Time_Table.jpgPrefilters_before_cleaning.jpegPrefilters_after_CLeaning_with_vaccumCleaner.jpeg 
  3   Thu Nov 8 15:06:17 2018 Loïc AmoudryFixedinfomechanics | lasers and optics | utilitiesOptical roomOptical closet contentElectronic:
EOM photoline NIR-MPX-LN-10, S/N:
2559-22 x1
  
  4   Fri Sep 20 13:08:51 2019 Ronic ChicheFixedinfomechanics | lasers and opticsOptical roomOneFive laser installationSBOX table cleaned and Origami 133MHz laser
installed.

power measurement with powermeter
  
  5   Mon Sep 23 16:48:29 2019 Ronic ChicheFixedinfomechanics | lasers and opticsOptical roomLaser isolatorNo optical isolator available.
One used a half waveplate, a PBS,
a faraday rotator and a PBS on a rotating
  
  6   Tue Oct 8 17:57:53 2019 Ronic ChicheFixedinfomechanics | lasers and opticsOptical roomCVBG and laser spectrumCVBG has been installed but reflected power
is much lower than before (new power in black
with OD1 filter, old power in red... see
 Fiber_injection_scheme.pdf20110721_PB_ORIGAMI.pdf 
  7   Wed Oct 9 14:59:17 2019 Ronic ChicheFixedinfomechanics | lasers and opticsOptical roomCVBG laser spectrumFrep et CEP motors action has no effect
on the spectrum central wavelength.

See the plot of the total OneFive
 OneFive_spectrum.png 
  9   Tue Oct 15 10:27:35 2019 Ronic ChicheFixedinfomechanicsOptical roomChilller installationYesterday, we installled again the chillers
for the 2nd and 3rd stages of the 50W laser
amplifier.
  
  13   Mon May 9 18:43:41 2022 Manar AmerFixedreportmechanicsOptical roomscrews for the ring fixing the mirrors On Friday, when placing the mirror in the
mount inside the cavity, the mirror is fixed
using a ring with 3 screws
  
  2   Wed Sep 26 12:58:44 2018 Huan WangFixedinfolasers and opticsOptical room200kW & 160kW 30min runthe attched image is the plot of the datas
from two high power experiments,
 200kW_&_160kW.png 
  8   Thu Oct 10 11:54:45 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFiber injectionThe power reflected by the CVBG after the
PBS is measured at 8.16mW (powermeter without
AA-OD1 filter)
  
  10   Fri Oct 18 12:42:16 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFiber injection and amplifier diagnosticsToday with Titouan, we installed a 10-90%
fiber coupler between the EOM and the amplifier
to have a diagnostic of the fiber injection
  
  11   Tue Oct 22 15:26:52 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFiber injection and amplifier diagnosticsThe fiber connected to the 2nd stage photodiode
was broken.
Thus, one connected the Auxilary output
  
  12   Mon Jan 6 12:41:43 2020 Ronic ChicheFixedinfolasers and opticsOptical roomFiber injection and amplifier diagnosticsthis morning, the photodiode from the fiber
coupling was only at 17mV (it was 40mV before
the Christmas holidays).
  
  16   Thu May 16 16:20:17 2024 Aurélien MartensFixedinfodetectors and electronicsOptical roomreport on dead EOMsI tested the status of several EOMs by
injecting them with the CW OEWaves laser.
Its power is of 15.37mW. 
  