  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaning

this afternoon, we checked the dust meter which is at 0 for 1 and 5µm dust particles but ~ 2000-3000 for 0.3µm particles.

we opened the two top panels to let the air flow clean the inside of the vessel.

we observed some other minor oxydised regions (than the one taken in picture) on the external parts of the inox panels but at first sight, nothing inside the vessel.

Ronic Chiche wrote:

this morning with Alice and Daniele, we removed all the optics elements and equipments from the SBOX optical table and started to clean it.
the dust meter count 0 on all particle sizes after the cleaning.

we observed a small part of the SBOX which seems to be oxydised (see picture).

the two previously used mirrors of the SBOX (C23018/7 and C23017/2) were already in their plastic boxes outside of the SBOX.
they are still on the optical table.

we have to decide which mirrors to put in the cavity:

if we don't want to use a "new" ThomX coupling mirror M1, we have to use a Gamma-factory mirror (161185) with T=460ppm for example (we don't have any other FS plan mirrors).

if we don't plan to work at high power in the SBOX for the moment, we could use an "old" ThomX M2 mirror with ROC=2.241m (C1611/11) to avoid any risk of contamination of a "new" ThomX M2 mirror.

 

  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaning

now, it seems the table is clean enough (dust meter counts 0 particles) to install a 2 mirrors FP-cavity.

Ronic Chiche wrote:

this afternoon, we checked the dust meter which is at 0 for 1 and 5µm dust particles but ~ 2000-3000 for 0.3µm particles.

we opened the two top panels to let the air flow clean the inside of the vessel.

we observed some other minor oxydised regions (than the one taken in picture) on the external parts of the inox panels but at first sight, nothing inside the vessel.

Ronic Chiche wrote:

this morning with Alice and Daniele, we removed all the optics elements and equipments from the SBOX optical table and started to clean it.
the dust meter count 0 on all particle sizes after the cleaning.

we observed a small part of the SBOX which seems to be oxydised (see picture).

the two previously used mirrors of the SBOX (C23018/7 and C23017/2) were already in their plastic boxes outside of the SBOX.
they are still on the optical table.

we have to decide which mirrors to put in the cavity:

if we don't want to use a "new" ThomX coupling mirror M1, we have to use a Gamma-factory mirror (161185) with T=460ppm for example (we don't have any other FS plan mirrors).

if we don't plan to work at high power in the SBOX for the moment, we could use an "old" ThomX M2 mirror with ROC=2.241m (C1611/11) to avoid any risk of contamination of a "new" ThomX M2 mirror.

 

 

  237   Fri Jun 13 20:10:00 2025 Alice RenauxFixedreportlasers and opticsOptical roomDamaged mirrors test

Today with Dorian we tested three mirrors with which we previously haven't been able to obtain any resonance or optical beating :

- C16111/11 : The mirror looks normal under a microscope, apart from a few inclusions and maybe a small scratch towards the edge. We tested it with a 161186 M1 mirror and we weren't able to obtain any optical beating on the cavity's mirrors or resonance.

- 161185 (1) : The mirror looks normal with the naked eye. We tested it with a 161182 M2 mirror and we were able to notice some optical beating on the cavity's mirrors as well as small resonance peaks and a higher-order transverse mode.

- 161185 (2) : The mirror shows some damage on the substrate side (not the coated side). We tested it with a 161186 M2 mirror and we were able to notice some optical beating on the cavity's mirrors as well as huge resonance peaks and a Gaussian transverse mode.

The updated recap file is available here, as well as a few pictures.

  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiode

After installing the 2nd EOM, we had some trouble to be able to lock again.
One possible reason was the very low signal level in transmission, which is important to trigger the locking system (and stop it).

See the Alice post for details, but we were able to measure only once the Finesse of the cavity at around 2600.

After the Finesse measurement, we opened the box to change the M1 mirror... so the box is at ambient pressure now.

I took back the avalanche photodiode from the Minicav room and installed it on the setup to replace the FPC transmission photodiode.
Now, the transmission peaks are at the 1V level, and it's very easy to trigger on...
The system locked very easily, even without being under vacuum.
It will help if we need to inject very low power laser (e.g. OEwaves after 2x EOM and AOM).

 