HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software Screenshot_2022-05-30_0_125247.png20220530_00_Mode.bmp11.bmp
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 20220607_SBox_Setup.pngMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
       Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 00_Mode_Locked_Under_vacuum.bmpMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
          Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
Message ID: 95     Entry time: Wed Jun 8 11:10:17 2022     Reply to this: 97
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics | detectors and electronics | software 
 Location: Optical room 
 Title: Cavity Lock  

Start with the cavity lock images attached, taken from last week, at start we have a coupling ~ 5%  and started improving on the alignment .

The image of 00 modes attached corresponds to the coupling seen on the oscilloscope.

We have a higher coupling with the 11 mode due to the size of the injected beam in comparison to mode

lenses were added to improve it.

Attachment 1: Screenshot_2022-05-30_0_125247.png  35 kB  | Show | Show all
Attachment 2: 20220530_00_Mode.bmp  1.953 MB
Attachment 3: 11.bmp  1.953 MB
ELOG V3.1.4-395e101