Entry   Microscope and cleaning of SBOX mirrors, posted by Loïc Amoudry at Optical room about lasers and optics resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG
    Reply   Power up to 48kW crater effect again, posted by Loïc Amoudry at Optical room about lasers and optics 3A_136mWtrans.png4A_126mWtrans.pngmode_strange.png
Message ID: 57     Entry time: Thu Feb 6 16:58:57 2020     In reply to: 46
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Power up to 48kW crater effect again 

As we said, after glow discharge and spin coater we recovered a low power finesse ~23000 (aligning away from the M1 crater).

Today, we have made some power up to 48kW (3A on 3rd stage). At this power, there was no important effect on the transmission which can be compared with the coupling (see image "3A_136mWtrans"). We waited ~20min without aligning and the power dropped slowly (misalignment) to 39kW. 

Then we increased the amplifier power to 4A and the power went up to 44kW. At this moment, the strange transmission behavior that we observed before mirror crater, appeared again (see image "4A_126mWtrans"). We also observed a mode deformation with the camera, see image "mode_strange". This shape was not depend of the camera/filter rotation angle and still appear with another camera.

Loïc Amoudry wrote:

The mirrors went in the cavity the 28th of november (We did several power up to 30kW stored and only one to 40kW then the power went down to 2kW during the run).

Microscope study shows that mirrors get some dust during the handling [travel from microscope to SBOX --> installation --> in SBOX for +1month and power up --> travel to microscope].

Almost all of these dusts can be removed with cleaning.

There is only one important difference between 28th of november and today, a large spot on M1

 

Attachment 1: 3A_136mWtrans.png  42 kB  | Show | Hide all | Show all
Attachment 2: 4A_126mWtrans.png  46 kB  | Show | Hide all | Show all
Attachment 3: mode_strange.png  240 kB  | Hide | Hide all | Show all
mode_strange.png
ELOG V3.1.4-395e101