|
HOME
SBOX
THOMX
MINICAV
Utilities
|
|
SBOX orders
SBOX installation
SBOX commissioning
SBOX control command
|
| Status of commissioning, report also here plots are reports. |
Not logged in |
 |
|
|
|
|
Message ID: 2
Entry time: Mon Oct 1 11:30:39 2018
Reply to this: 3
|
|
|
2 measurement.
First one locked, in transmission of M2 with 2nd stage 0A.Total 89 cm from the big waist (planar mirrors). 2 wedges used.
Second one at input beam with the same power. Datas taken at the same equivalent position than the first one. 3 wedges used. |
|
|
|