HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 22     Entry time: Mon Nov 5 13:11:08 2018
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: First run with spare mirrors 
I (A) Trans (mW) Coupling (%) Pin (W) Gain
0 4 70 0.37 4982
2 58 80 5.2 5140
4 180 75 16.1 5152
6 270 63 27.3 4558
8 340 60 36.7 4269

 

Attachment 1: Plot_power_and_gain_vs_all.JPG  128 kB  | Hide | Hide all | Show all
Plot_power_and_gain_vs_all.JPG
Attachment 2: powerup.xlsx  8 kB
ELOG V3.1.4-395e101