HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Coupling efficiency improvement, posted by Xinyi Lu at Optical room about lasers and optics beam_after_lens.png
    Reply   Coupling efficiency improvement, posted by Xinyi Lu at Optical room about lasers and optics Screenshot_2024-03-08_0_172245.png
       Reply   Coupling efficiency improvement, posted by Xinyi Lu at Optical room about lasers and optics Screenshot_2024-03-12_0_192348.png
          Reply   Injection at the amplifier current of 2 A, posted by Xinyi Lu at Optical room about lasers and optics 21kW_power_at_2A_injection.png
             Reply   Polarization issue, posted by Xinyi Lu at Optical room about lasers and optics Screenshot_2024-03-20_0_090501.pngScreenshot_2024-03-20_4_110622.pngM3_window.png
                Reply   Polarization issue, posted by Xinyi Lu at Optical room about lasers and optics 
                   Reply   Polarization issue & 50kW with 22W injection, posted by Xinyi Lu at Optical room about lasers and optics 50kW_with_22W_injection.png50_kW_power_at_3A_injection.png
Message ID: 196     Entry time: Thu Mar 7 18:55:42 2024     Reply to this: 197
 Author: Xinyi Lu 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: Optical room 
 Title: Coupling efficiency improvement 

- These days, Ronic, Fatematuj and I measured the beam parameters of the output of the third-stage amplifier.

- We used 2 wedges and reflection filters to reduce the intensity on the CCD.

- We measured multiple points at pump current of 2 A (output power ~10 W). The waist diameter of the output is w_x = 792.26 um, w_y=873.90 um.

- The next step is to design the telescope and improve the coupling efficiency.

Attachment 1: beam_after_lens.png  78 kB  | Show | Show all
ELOG V3.1.4-395e101