Entry   Install new mirrors, posted by Xinyi Lu at Optical room about lasers and optics New_mirrors.pngoscillations.jpglocking.jpg
    Reply   Install new mirrors, posted by Xinyi Lu at Optical room about lasers and optics New_mirrors.pngfinesse.pnglocking.jpg
       Reply   Install new mirrors, posted by Xinyi Lu at Optical room about lasers and optics New_finesse.png
          Reply   Install new mirrors, posted by Xinyi Lu at Optical room about lasers and optics M2.jpg
Message ID: 185     Entry time: Wed Jan 24 20:33:27 2024     In reply to: 184
 Author: Xinyi Lu 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: Optical room 
 Title: Install new mirrors 

Yesterday we checked the mirrors with UV light and there was some dust on the mirrors, especially M2.

Today, Daniele, Ronic and I removed M2 and observed it with a microscope. It was indeed dirty, despite we were careful in installing it before. After that we cleaned it with alcohol and mirror paper, then with a spin coater and pure water. After cleaning, we observed it again and it was much better but not perfect. Then we installed the M2 back. But we haven't succeeded in alignment and getting resonance.

Tomorrow is the newcomer's day, so we will continue with the cleaning and measurements on Friday.

Xinyi Lu wrote:

- Today, Ronic and I changed the signal generator to a low-noise one (with a delay time of only 0.5 us). Then we moved the D-shaped mirrors, optimized the alignment and locking. We re-measured the finesse and it is 16,760. It improves but not much.

- Tomorrow, we will clean the environment, open the cavity, and use UV light to see if there is any dust on the surface of the mirrors.

Xinyi Lu wrote:

- In the last two days, Ronic and I installed new mirrors after cleaning the environment, and locked the cavity.
- We added an AOM to feedback on the high-frequency noise, but the locking condition was still not good enough. We found out that the signal generator available for this AOM has a long delay time (3 us), which may lead to low feedback bandwidth. So tomorrow we will use another AOM and signal generator to optimize the locking.
- Under this not good enough locking, we measured the finesse. Unfortunately, the finesse was measured as 15,478, which is much lower than the expected 42,000. It means that about 260ppm of additional loss was introduced. We will measure the finesse again after optimizing the locking and coupling.

By the way, attached are the delay time results for phase modulation of different signal generators:
- RIGOL DG4162: 0.7 us (best)
- SIGLENT SDG6022X: 3 us
- SIGLENT SDG7032A: 2.9 us

 

 