<?xml version="1.0" encoding="ISO-8859-1"?>
<rss version="2.0">
<channel>
<title>ELOG MINICAV installation</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation</link>
<description>Status of installation, including shipping and de-installation of test setups.</description>
<generator>ELOG V3.1.4</generator>
<image>
<url>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/elog.png</url>
<title>ELOG MINICAV+installation</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation</link>
</image>
<item>
<title>Manar Amer, Fixed, report, mechanics | lasers and optics | detectors and electronics | cabling, Optical room, Minicav Updated SetUp </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/18</link>
<description>
&lt;p&gt;Enclosed is the current setup of the minicavity&lt;/p&gt;

&lt;p&gt;** made by Fred&lt;/p&gt;</description>
<pubDate>
Mon, 27 Sep 2021 10:08:01 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, mechanics, Other, Mirrors Mounts </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/17</link>
<description>
&lt;p&gt;Update, they are received and the order is logged in &lt;strong&gt;MINICAV orders&lt;/strong&gt;&lt;/p&gt;

&lt;p&gt;Mounts placed in SAS cupboard&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Manar Amer wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;The minicavity mirror mounts are located in the preparation room&amp;nbsp; before the clean room in the cupboard.&lt;/p&gt;

			&lt;p&gt;There are three mounts and two primary mounts for the mounts to be placed on.&lt;/p&gt;

			&lt;p&gt;Need another one to have a set of four --&amp;rarr; They are made specifically by the lab, order extra one&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Mon, 05 Jul 2021 10:04:21 +0200</pubDate>
</item>
<item>
<title>Ronic Chiche, Fixed, info, lasers and optics | vacuum, Optical room, Vacuum and locking tests</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/16</link>
<description>
&lt;p&gt;Today, the vacuum pressure inside the Minicav was good : 7.8e-6 mbar&lt;br /&gt;
the Gauge model is a Leybold PTR 90N =&amp;gt; see picture for details&lt;br /&gt;
surprisingly, the same gauge connected to the TurboVac SL 80 was not read with the same value (see pictures)&lt;br /&gt;
the Pfeiffer pumping system has its own gauge which gives an expected lower pressure value : 8.94e-7 mbar.&lt;/p&gt;

&lt;p&gt;we made a leakage test with the cavity valve closed:&lt;br /&gt;
we lost 0.2e-6 mbar in 15s which is roughly equivalent to 1e-3mbar in 20h !!!&lt;/p&gt;

&lt;p&gt;we made also a test of locking with the pumping system ON:&lt;br /&gt;
the silent block works pretty well and the locking doesn&amp;#39;t seem perturbated.&lt;br /&gt;
(air flow OFF and no talking during the lock)&lt;br /&gt;
we clearly saw a sensitivity of the lock to the laser power =&amp;gt; we can think to a feedback loop on the laser power with and AOM for example.&lt;/p&gt;</description>
<pubDate>
Fri, 07 May 2021 16:18:07 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, mechanics | lasers and optics, Other, Optical Windows installed</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/15</link>
<description>
&lt;p&gt;A new optical window was installed in place of the old broken one (it was broken from the sides, a sign there might have been a leakage before !!! )&lt;/p&gt;

&lt;p&gt;The old broken window is placed in a container in SAS room in the gray cupboard titled &amp;quot;old window broken on the side&amp;quot;&lt;/p&gt;

&lt;p&gt;The one changed is &lt;u&gt;&lt;strong&gt;the output window behind M2 and M4&lt;/strong&gt;&lt;/u&gt;&lt;/p&gt;

&lt;p&gt;Properties of the new window attached&lt;/p&gt;</description>
<pubDate>
Thu, 06 May 2021 17:40:49 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, mechanics | vacuum, Other, vacuum Joint installed</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/14</link>
<description>
&lt;p&gt;The placement of the new ordered optical joint for the minicav&lt;/p&gt;</description>
<pubDate>
Thu, 06 May 2021 17:36:20 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, lasers and optics, Other, Telescope to match Koheras with minicav</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/13</link>
<description>
&lt;p&gt;The telescope to adjust the beam size was made only using one lens with very long focal length (1 meter)&lt;/p&gt;

&lt;p&gt;it is placed a distance of 40 cm from the collimeter and 1 meter from the center of the beam waist between the planar mirrors.&lt;/p&gt;

&lt;p&gt;This way the two beam (of laser and cavity) have the shape when they propagate&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;

&lt;p&gt;(&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; )&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; /-----------()------- 40 cm ----------(collimater)_______[Koheras]&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; |&lt;/p&gt;

&lt;p&gt;\&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; w|--------------/-------100 cm -------------/&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Manar Amer wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;The beam waist of the Koheras CW laser after the collimater is bigger than the Waist required for injection inside the cavity at M1.&lt;/p&gt;

			&lt;p&gt;A Telescope is to be made to match the two beams.&lt;/p&gt;

			&lt;p&gt;Details will be added ......&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Thu, 22 Apr 2021 16:59:12 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, lasers and optics, Other, Telescope to match Koheras with minicav</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/12</link>
<description>
&lt;p&gt;The beam waist of the Koheras CW laser after the collimater is bigger than the Waist required for injection inside the cavity at M1.&lt;/p&gt;

&lt;p&gt;A Telescope is to be made to match the two beams.&lt;/p&gt;

&lt;p&gt;Details will be added ......&lt;/p&gt;</description>
<pubDate>
Tue, 20 Apr 2021 15:57:49 +0200</pubDate>
</item>
<item>
<title>Ronic Chiche, Under Process, report, lasers and optics, Other, First alignement of the Koheras with the FP cavity</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/11</link>
<description>
&lt;ul&gt;
	&lt;li&gt;We changed the mirrors position back to the original reference (0, 0, 0, 0) for all mirrors, but the alignment could not be found.&lt;/li&gt;
	&lt;li&gt;The course of action will be :&lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; -&amp;nbsp; abandon the alignment done previously with Helium Neon Laser&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; - Set and distance between the spherical M3-M4 to a value that stabilizes the cavity, and keep the distance between the planar at zero reference.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; -&amp;nbsp; Align the cavity from the start with the koheras&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; - after finishing the alignment, change the distance between the planar mirrors M1-M2 mirrors to match the rep. frequency 876.3636 MHz&amp;nbsp;&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; While maintaining the alignment.&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Ronic Chiche wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;today with Manar, we brought the Koheras to the Minicav optical room and aligned it with the Iris used for the cavity.&lt;/p&gt;

			&lt;p&gt;but if I properly understood what Manar said to me, the cavity mirrors have been moved by roughly 1cm after Daniele and Manar finished the alignment.&lt;br /&gt;
			with what we saw today, it seems the cavity is not aligned anymore.... we will check that tomorrow with Daniele.&lt;br /&gt;
			we have a beam at the output window but </description>
<pubDate>
Tue, 20 Apr 2021 15:56:05 +0200</pubDate>
</item>
<item>
<title>Ronic Chiche, Under Process, report, lasers and optics, Other, First alignement of the Koheras with the FP cavity</title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/10</link>
<description>
&lt;p&gt;today with Manar, we brought the Koheras to the Minicav optical room and aligned it with the Iris used for the cavity.&lt;/p&gt;

&lt;p&gt;but if I properly understood what Manar said to me, the cavity mirrors have been moved by roughly 1cm after Daniele and Manar finished the alignment.&lt;br /&gt;
with what we saw today, it seems the cavity is not aligned anymore.... we will check that tomorrow with Daniele.&lt;br /&gt;
we have a beam at the output window but I&amp;#39;m quite sure it only goes through M1 and not M2 anymore... and then directly to the output window in between M2 and M4.&lt;/p&gt;

&lt;p&gt;the other important point for us is the room temperature.&lt;br /&gt;
it seems to be set at 25.5&amp;deg;C or something like that.&lt;br /&gt;
it&amp;#39;s much too high.&lt;br /&gt;
Aur&amp;eacute;lien, who is the person to contact to change this temperature?&lt;br /&gt;
a setting around 21&amp;deg;C would be much more convenient...&lt;/p&gt;

&lt;p&gt;&lt;!--EndFragment--&gt;&lt;/p&gt;</description>
<pubDate>
Mon, 19 Apr 2021 18:21:51 +0200</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, report, mechanics, Other, Mirrors closely backed when Fixed </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/9</link>
<description>
&lt;p&gt;Throughout all the range of motion for the motors &amp;nbsp;&lt;/p&gt;

&lt;p&gt;-&amp;rarr; no problem with the mirrors close together (M1-M3 and M2-M4) hitting each other.&lt;/p&gt;

&lt;p&gt;-&amp;#8702; the problem with the pinholes hitting each other was fixed by trimming their edges a little, no issue for M1-M3 and M2-M4 now.&amp;nbsp;&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Manar Amer wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;The mirrors were placed in the wrong orientation, it was adjusted correctly&lt;/p&gt;

			&lt;p&gt;but the issue of having the mirrors/irises hitting each other was still there.&lt;/p&gt;

			&lt;p&gt;The motors need to be moved in the longitudinal position to avoid this issue.&lt;/p&gt;

			&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
				&lt;tbody&gt;
					&lt;tr&gt;
						&lt;td style=&quot;background-color:#486090&quot;&gt;Manar Amer wrote:&lt;/td&gt;
					&lt;/tr&gt;
					&lt;tr&gt;
						&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
						&lt;p&gt;As shown in the image attached when placing the mirror mounts (or irises) of the very close mirrors on the mounts they hit each other.&amp;nbsp;&lt;/p&gt;

						&lt;p&gt;The motor&amp;#39;s location needs to be changed for them not to hit each other (pushed a little to the back or the front)&lt;/p&gt;

						&lt;p&gt;This restricts the motion of the motors later on.&lt;/p&gt;

						&lt;p&gt;Not sure if this was the case before changing the plate or only after&lt;/p&gt;

						&lt;p&gt;&amp;nbsp;&lt;/p&gt;
						&lt;/td&gt;
					&lt;/tr&gt;
				&lt;/tbody&gt;
			&lt;/table&gt;

			&lt;p&gt;&amp;nbsp;&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Tue, 23 Mar 2021 14:36:01 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, issue, mechanics, Other, Mirrors closely backed when Fixed </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/8</link>
<description>
&lt;p&gt;The mirrors were placed in the wrong orientation, it was adjusted correctly&lt;/p&gt;

&lt;p&gt;but the issue of having the mirrors/irises hitting each other was still there.&lt;/p&gt;

&lt;p&gt;The motors need to be moved in the longitudinal position to avoid this issue.&lt;/p&gt;

&lt;table align=&quot;center&quot; cellspacing=&quot;1&quot; style=&quot;border:1px solid #486090; width:98%&quot;&gt;
	&lt;tbody&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#486090&quot;&gt;Manar Amer wrote:&lt;/td&gt;
		&lt;/tr&gt;
		&lt;tr&gt;
			&lt;td style=&quot;background-color:#FFFFB0&quot;&gt;
			&lt;p&gt;As shown in the image attached when placing the mirror mounts (or irises) of the very close mirrors on the mounts they hit each other.&amp;nbsp;&lt;/p&gt;

			&lt;p&gt;The motor&amp;#39;s location needs to be changed for them not to hit each other (pushed a little to the back or the front)&lt;/p&gt;

			&lt;p&gt;This restricts the motion of the motors later on.&lt;/p&gt;

			&lt;p&gt;Not sure if this was the case before changing the plate or only after&lt;/p&gt;

			&lt;p&gt;&amp;nbsp;&lt;/p&gt;
			&lt;/td&gt;
		&lt;/tr&gt;
	&lt;/tbody&gt;
&lt;/table&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Thu, 11 Mar 2021 11:04:55 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Fixed, issue, mechanics, Other, Mirrors closely backed when Fixed </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/7</link>
<description>
&lt;p&gt;As shown in the image attached when placing the mirror mounts (or irises) of the very close mirrors on the mounts they hit each other.&amp;nbsp;&lt;/p&gt;

&lt;p&gt;The motor&amp;#39;s location needs to be changed for them not to hit each other (pushed a little to the back or the front)&lt;/p&gt;

&lt;p&gt;This restricts the motion of the motors later on.&lt;/p&gt;

&lt;p&gt;Not sure if this was the case before changing the plate or only after&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Mon, 08 Mar 2021 18:47:39 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Not Fixed, report, mechanics, Other, Screws Length </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/6</link>
<description>
&lt;p&gt;Specific length (5 mm) for the screws used to fix the mirrors and the irises in the cavity box&lt;/p&gt;

&lt;p&gt;need to search for extra, don&amp;#39;t have enough&lt;/p&gt;

&lt;p&gt;the amount needed&amp;nbsp; (3 x 4 = 12) at least, each mirror is fixed with three screws&lt;/p&gt;</description>
<pubDate>
Mon, 08 Mar 2021 18:35:06 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Not Fixed, report, lasers and optics, Other, Spare Mirrors </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/5</link>
<description>
&lt;p&gt;There are spare mirrors placed in the preparation room of the minicavity&lt;/p&gt;

&lt;p&gt;the exact number to be investigated&lt;/p&gt;

&lt;p&gt;approx ~ 12&amp;nbsp; -&amp;rarr;&amp;nbsp; &amp;nbsp; 9 of them are injection &amp;nbsp;&lt;/p&gt;</description>
<pubDate>
Mon, 08 Mar 2021 18:33:41 +0100</pubDate>
</item>
<item>
<title>Manar Amer, Not Fixed, issue, lasers and optics, Other, Mirrors Damage </title>
<link>http://elog-ijclab-in2p3-fr.lal.in2p3.fr:8087/MINICAV+installation/4</link>
<description>
&lt;p&gt;The mirrors have what seems to be damage spots on them&lt;/p&gt;

&lt;p&gt;&lt;u&gt;&lt;strong&gt;To be investigated after finishing the alignment&amp;nbsp;&lt;/strong&gt;&lt;/u&gt;&lt;/p&gt;

&lt;p&gt;attached a picture of the mirror (To show the mirror size scale)&lt;/p&gt;</description>
<pubDate>
Mon, 08 Mar 2021 18:33:24 +0100</pubDate>
</item>
</channel>
</rss>
