HOME SBOX THOMX MINICAV Utilities
MINICAV orders MINICAV installation MINICAV commissioning MINICAV control command
  Status of commissioning, report also here plots are reports., Page 3 of 5  Not logged in ELOG logo
ID Date Author Status Type Category Locationdown Title Text Attachments
  38   Wed Oct 20 15:27:51 2021 Ronic ChicheFixedreportlasers and opticsOptical roomAmplitude GHz oscillator phase noise with PZT effectThorlabs PZT datasheet.
Reference: PC4QR

 PC4QR-SpecSheet-1.pdf 
  39   Thu Oct 21 09:44:35 2021 BlancFixedinfomechanics | lasers and optics | detectors and electronicsOptical room1GHz oscillator Frep measurementThe optical spectrum of the GHz oscillator:
FWHM ~ 4nm

 Spectre_GHz-3.PNG 
  43   Thu Dec 2 16:12:17 2021 Aurélien MartensFixedreportmechanics | softwareOptical roomnew smaract positionsM1 and M2 at 5.1085mm and M3 and M4 at
-2.9mm
  
  44   Mon Dec 6 11:22:08 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras Calibration 




 grab2021-12-06_10-51-34_325_microscope.bmpgrab2021-12-06_10-52-11_108_microscope_calib_05mm_ruler.bmp 
  45   Tue Dec 7 11:48:33 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras CalibrationAfter check a mistake has been found on
the magnification. This seems to be the good
calibration (feel free to cross check). The
 Plot_of_NF_Trans_calib_hex2mm__2021-06-23__17-06-49.pngPlot_of_NF_Refl_calib_hex2mm__2021-06-23__16-59-26.png 
  46   Fri Dec 10 16:57:56 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 10 12 2021 (optimization injection Burst)Manip 10/12/2021
Après recherche de la résonnance
principale
 NF_Refl__2021-12-10__14-25-08.pngtest__2021-12-10__14-25-08_1920_25gm.png 
  47   Tue Dec 14 12:59:07 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Matin :

moteurs :
M1, M2 (plans): 5.110500m
 Screenshot_2021-12-14_2_125459.png 
  48   Thu Dec 16 10:40:55 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Après-midi :
    * Optimisation
de l'alignement en injection pour avoir
 Screenshot_2021-12-14_3_182645.png 
  49   Thu Dec 16 12:12:10 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissanceMatin: 
* Redémarrage Tangor 4W
    - couplage 15%
 Screenshot_2021-12-16_0_115846.png 
  50   Thu Dec 16 12:13:52 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissance 




 Screenshot_2021-12-16_1_121553.png 
  51   Thu Dec 16 18:16:12 2021 BlancUnder Processinfolasers and opticsOptical roomChangements et ajout d'optiquesOptiques ajoutées :

- splitter 90/10 au début
de la voie de réflexion, pour éjecter
  
  52   Fri Dec 17 17:03:34 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 17 12 2021 reprise réf nouvelle injection pour polarisationTangor : 4.2W
* Réalignement de l'injection
suite aux modifications :
 Screenshot_2021-12-17_0_164132.pngScreenshot_2021-12-17_1_170202.png 
  53   Mon Mar 28 17:10:33 2022 BlancFixedinfolasers and optics | detectors and electronicsOptical roominput and output power of the AOM 50MHzInput power of the AOM :

150mW

output power of the AOM :
  
  54   Tue May 17 17:28:31 2022 BlancFixedissuelasers and optics | detectors and electronicsOptical roomDifférence de fréquence Tangor/Lockline- On a observé que le fondamental
du Tangor et celui de la Lockline n'étaient
pas situés à la même
 Freq_Tangor_Lockline_120_MHz.PNGFreq_Tangor_Lockline_80_MHz.PNGLock_Tangor_2W.PNG 
  55   Thu May 19 10:04:05 2022 BlancUnder Processreportlasers and opticsOptical roomChangement cadence et duty cycle + ref cam- Prise des nouvelles ref caméras
: NF{709;371} , FF{389;280} [Image 1 &
2]
 Ref_NF_inj_18_05_2022.pngRef_FF_inj_18_05_2022.pngScreenshot_2022-05-18_2_165654.pngScreenshot_2022-05-18_5_173440.pngScreenshot_2022-05-18_6_174947.png 
  56   Tue Jun 14 11:16:37 2022 BlancUnder Processissuelasers and opticsOptical roomProblèmes CavitéePrécédentes ref pour lesquelles
la manip fonctionnait :

Caméras :
 Transmission.PNGNF_inj.PNGFF_inj.PNG 
  57   Tue Jan 10 18:04:20 2023 BlancFixedinfolasers and opticsOptical roomDonnées pour la baisse en cadencePosition Cam :

692;363 NF_inj
520;193 FF_inj
 7x 
  58   Wed Jan 18 17:52:33 2023 BlancFixedinfolasers and opticsOptical roomTests et mesures locklineMesures de puissance fibres lockline :

AVANT POLISSAGE

injection premier étage
  
  59   Thu Jan 19 14:56:27 2023 BlancFixedinfolasers and opticsOptical roomTests et mesures lockline 




 AOM_250_drivé_à_160_MHz_sortie_fibre_bleue.pngschéma_mesures_lockline_18_01_2023.PNG 
  60   Thu Jan 19 15:05:58 2023 BlancFixedinfolasers and opticsOptical roomSuite Mesures de puissance locklineChangement d'AOM pour passer sur l'AOM
200 MHz.

Le schéma suivant récapitule
 schéma_mesures_lockline_19_01_2023.PNG20230119_124318.jpg 
ELOG V3.1.4-395e101