  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Tests et mesures lockline, posted by Blanc at Optical room about lasers and optics 
    Reply   Tests et mesures lockline, posted by Blanc at Optical room about lasers and optics AOM_250_drivé_à_160_MHz_sortie_fibre_bleue.pngschéma_mesures_lockline_18_01_2023.PNG
Message ID: 59     Entry time: Thu Jan 19 14:56:27 2023     In reply to: 58
 Author: Blanc 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: Optical room 
 Title: Tests et mesures lockline 

 

Blanc wrote:

Mesures de puissance fibres lockline :

AVANT POLISSAGE

injection premier étage : 15 mW

sortie premier étage : 63 mW

Sortie AOM à 250 MHz : 2.5 mW

Sortie EOM : 1.3 mW

Sortie : 20 =>40 mW

APRES POLISSAGE

injection premier étage : 15 mW

sortie premier étage : 63 mW

Sortie AOM à 159 MHz : 2.9 mW            Sortie AOM à 250 MHz : 15 mW

Sortie EOM : 1.5 mW                              Sortie EOM : ?

Sortie : 47 mW                                        Sortie : 54 mW

 

Même après polissage de la fibre de sortie du premier étage, on observe que la puissance diminue d'un facteur 4 à travers l'AOM drivé à sa fréquence nominale.

 

Attachment 1: AOM_250_drivé_à_160_MHz_sortie_fibre_bleue.png  60 kB  | Hide | Hide all
AOM_250_drivé_à_160_MHz_sortie_fibre_bleue.png
Attachment 2: schéma_mesures_lockline_18_01_2023.PNG  60 kB  | Hide | Hide all
schéma_mesures_lockline_18_01_2023.PNG
ELOG V3.1.4-395e101