Message ID: 28     Entry time: Tue Oct 5 11:35:16 2021
 Author: Aurélien Martens 
 Status: Fixed 
 Type: report 
 Category: detectors and electronics | software 
 Location: Optical room 
 Title: new position of smaract motors 

a cavity length measurement gave 880.9Mhz. The m1/M2 have been put to +5.1000mm both M3/M4 srill at -2.9mm